Operating instructions wet waste treatment unit, Model AZP 80, AZ / AP 80
Datei:BA_AZP80_AZ_AP_9633432_EN_2005-10.docx
9633432
24/36
W e reserv e the right to c hange ex ec ution and constr uction!
MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121
11.3 Cleaning instruction – daily
Do not use a high pressure cleaner!!!
Press the “OFF” button for
the final cleaning cycle.
After approx. 15 min. this
cycle is terminated
automatically.
(Operating pannel AZP 80)
Press the EMERGENCY
STOP switch off!
(Operating pannel AZP 80)
Open drain valve.
Open the tank cover and the cleaning door of the wet
waste press. Flush out the interior of the press and the
protection hatch of the discharge chute.
Lift the flap and flush out
the tank and the
shredding mechanism,
using a water hose and
warm water, if possible.
Flush out the inlet
chute in the
direction of the
tank.
Clean the level
control system's
electrodes.
Now remove the
bottom screen box
and any remaining
waste, metal parts,
etc. from the tank.
Empty out and clean
the bottom screen
box.
Re-insert the bottom
screen box when it is
clean.
Option flushing trough:
The flushing trough must be cleaned daily!
The machine, switch cabinets and other electrical components must NOT be
sprayed with a hose or a high pressure cleaner.