Operating instructions wet waste treatment unit, Model AZP 80, AZ / AP 80
Datei:BA_AZP80_AZ_AP_9633432_EN_2005-10.docx
9633432
22/36
W e reserv e the right to c hange ex ec ution and constr uction!
MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121
10.2 Operation
Close the drain valve.
Open the stop valve on the
water pipe.
Switch on the main
power supply from the
building.
Insert the screen in the tank.
Close the tank cover.
Insert the screen tube
and the worm spindle.
Close the cover and the
cleaning door of the wet
waste press.
Release the EMERGENCY
STOP switch.
(Operating pannel AZP 80)
Press the "FILLING"
button.
(Operating pannel AZP
80)
The filling is made automatically. After reaching the necessary filling level the water
level control is switched off and the green lamp indicates: "READY".
Press the "BEGIN
OPERATION" button.
(Operating pannel AZP 80)