800 max
800 max
22
4-INSTALLATION AND ASSEMBLY
PELLET LOADING CHUTE ASSEMBLY
Another choice to be made before placing the product is to define the side where to install the chute for loading the fuel. Vivo 85 Hydro
pellet is delivered with two clamps, the connection pipe and the chute with hatch.
The chute may be mounted on the right side, on the left side or at the front. The connection pipe is 1 metre long.
It is obligatory
to shorten the connection pipe, depending on positioning (side or front), so that it is properly taut and at a minimum
angle with respect to the horizontal, as shown in the drawing. This operation is required for pellet descent.
Before installing the cladding perform a fuel loading test to ensure it descends correctly towards the hopper.
It is obligatory to provide for correct insulation of the pipe in case it is fitted on the left side where the smoke exhaust is. Fire risk!
Chute assembly
In the event of opting for side pipe installation, the distance from the machine axis to the wall must be 80 cm maximum (picture on the
side).
To position the chute, proceed as follows:
• Connect the pipe supplied to the product ensuring it is rotated to the side, and fasten it with the clamp.
• Connect the pipe (in the top section) to the mouth of the hatch structure by means of the clamps supplied.
• Position the pipe with the hatch structure so that, when cladding is completed, it may be screwed and fixed to the wall of the
cladding at the hole made to insert it.
• To mount the outer hatch, which should only be done when cladding is completed, refer to the suitable paragraph.
Summary of Contents for Vivo 85 Hydro
Page 1: ...INSTALLATION GUIDE EN INSERT VIVO 85 PELLET HYDRO Instructions in English...
Page 73: ......
Page 74: ......
Page 75: ......