62
BA550001-en
Bleeding by means of hand pumps
1 Pump the pit jack using the fast stroke (C) until the pit jack has moved
approx. 100-200 mm.
2 Immediately afterwards, pump up the load stroke (B) and also perform the
lifting movement without pausing for approx. 100-200 mm.
3 Now actuate the fast stroke (C) pump again and move the pit jack to the
mechanical stop. Pit jack is now fully extended
4 Actuate the load stroke (B) pump at the mechanical stop and perform
approx. 10-20 pump strokes.
5 Switch to fast stroke (C) pump and carry out approx. 10-20 pump strokes.
6 Lower the pit jack to the home position using the drain plug (A).
7 Repeat the procedure until the piston rod moves smoothly.
B
A
B
C
A
Summary of Contents for MPJ Series
Page 6: ...6 BA550001 en Blank page...
Page 13: ...BA550001 en 13 6 Technical data 6 1 Relevant pit dimensions...
Page 29: ...BA550001 en 29 10 mm...
Page 35: ...BA550001 en 35...
Page 39: ...BA550001 en 39 I F H G J A E C D K B...
Page 114: ...20 PL670000_002 de...