Page
60
of
63
Refitting / Replacement
Step 5 - Refitting is a reversal of the removal process noting the following point:
A)
Ensure when fitting the male and female parts together that the shim washers are still in
place.
B)
The Female part of the Traverse Idle Gear must be on the same face as the PCB
C)
When securing the two gears together,
do not overtighten.
Once tight, loosen the screw
by half a turn to allow the gear ability to rotate freely.
Communications Port
Within this section it will explain the correct procedure on removing and reinstalling the
Communications Port for servicing procedures or replacement.
Removal
Step 1 - Remove external covers off the Hoist. (Refer to section 9.1)
Step 2
–
Remove the Battery from the battery brackets. (Refer to section (9.3)
Step 3
–
Disconnect the Communications Port from the PCB.
Step 4
–
Reroute the Wire from behind the PCB and from under the opposite sides battery
bracket.
Step 5
–
Cut the three cable ties that secure the wire to the Chassis.
Summary of Contents for TX440 Advanced PT
Page 10: ...Page 10 of 63...
Page 11: ...Page 11 of 63...