
UNLOADING AND ASSEMBLY
Form # 169080
Model Year - 2010
24
B. 3-POINT HITCH (CAT. II, III, OR
IIIN)
I.
INSTALL THE 3-POINT HITCH YOKE
a. Attach the 3 point hitch yoke (A) to the APT
with pin (B). The installation is similar to that
described in the previous section.
b. Secure pin (B) with clevis pin (C), washers,
and cotter pin.
c. The arms (D) on APT yoke can be set up to
suit the tractor hitch arms:
1. Remove pins (E) from arms.
2. Remove arms (D) from APT yoke.
3. Re-install arms on opposite ends of yoke
as shown.
4. Re-install pins (E) in arms.
NOTE
Bushings (F) on pins can be removed to suit
hole size in tractor hitch arms.
II.
ATTACH MOWER-CONDITIONER TO
TRACTOR
a. Position tractor and align tractor hitch arms (G)
with windrower arms (H). Use jack (J) to adjust
height of windrower APT.
b. Secure arms with lynch pins (K).
c. Install anti-sway bars on tractor hitch to stabilize
lateral movement of hitch arms (G). Refer to your
tractor operator’s manual.
d. Check distance ‘
X
’ between tractor PTO shaft (L)
and implement input shaft (M) (without the front
half of the driveline attached).
(continued next page)
CATEGORY II or IIIN
CATEGORY III
D
E
F
K
G
H
CAT. II & IIIN CONFIGURATION
J
B
C
A
X
TRACTOR AXLE
R80 WINDROWER
L
M