UNLOADING AND ASSEMBLY
Form # 169080
Model Year - 2010
12
STEP 5. REMOVE SHIPPING
CHANNELS AND
BLOCKING
a. Cut the banding on the shipping beam at the
rear of carrier frame and remove components
from inside the shipping beam.
NOTE
Hardware bag is for STEP 20. INSTALL
FORMING SHIELD.
b. Place LH spring assembly (heavy) near LH
side of carrier. Place RH spring assembly
(light) near RH side of carrier.
NOTE
The following steps remove the stand as
an assembly. These components may
also be removed individually.
c. Place blocks under the shipping beam at the
rear of the carrier frame.
d. Loosen the shipping stand bolt at the lower
end of each carrier frame leg.
e. Remove the bolt that secures shipping stand at
each float spring anchor.
f. Remove the support blocks and lower the
shipping stand to the ground.
g. Remove bolts at carrier frame legs and remove
shipping stand frame.
h. Cut banding that secures angles to carrier frame
tube and remove angles.