UNLOADING AND ASSEMBLY
Form # 169080
Model Year - 2010
16
STEP 8. ATTACH APT
CAUTION
Keep hands clear when lowering APT.
a. Remove the six bolts and nuts from frame and
retain for reinstallation.
b. Using a forklift or equivalent, manoeuvre APT
into position and install pivot pin (A) into
mower-conditioner frame.
NOTE
Use the jack to adjust the pitch of the
APT for proper alignment when installing
pivot pin.
NOTE
Pin may need to be tapped into final
position with a hammer due to the tight
clearances.
c. Secure pivot pin (A) to frame by installing six 5/8 x
1.75 long Gr. 8 bolts (C) with lock nuts removed at
step a. Install bolts with heads facing aft.
d. Torque to 250 ft-lbf (339 N·m).
e. Install bolt (B), lockwasher, and flatwasher
removed at STEP 7g. at lower end of pivot pin
and tighten bolt.
f.
Position APT with jack so that rear span of APT is
approximately horizontal. Remove lifting chain
from APT.
g. Check oil level in site glass (D) on the left side of
the APT, is between ADD and FULL.
h. If necessary add single grade trans-hydraulic oil at
filler pipe (E).
RECOMMENDED OILS
Petro-Canada Duratran
Chevron 1000 THF
Case IH Hy-Tran Plus®
Agco Power Fluid 821XL
New Holland Hydraul
Esso/Exxon Hydraul 56
Shell Donax TD
John Deere Quatro® J20C
D
E
A
C
B
A