
214805
42
Revision A
1005635
A
B
C
Figure 3.79: Support Bracket and Hose Bundle
2.
Remove cap (A) from the electrical connector, and remove
the connector from the support bracket.
3.
Disengage and rotate lever (B) counterclockwise to fully up
position to release the hose bundle (C).
4.
Move hose/electrical bundle (C) to header.
1005264
A
B
C
D
E
Figure 3.80: Hose and Electrical Bundle
–
4.3 m and
4.9 m (14 ft. and 16 ft.) Header Shown (5.5 m [18 ft.]
Header Similar)
5.
Route bundle (A) from windrower through support (B) and
access hole (C) in header frame alongside existing hose
bundle (D) from header.
6.
Remove cover on header electrical receptacle (E).
7.
Push connector onto receptacle, and turn collar on
connector to lock it in place.
8.
Attach cover to mating cover on windrower wiring harness.
9.
Remove caps from hydraulic couplers. Clean if necessary.
1022457
A
B
C
D
Figure 3.81: A40D Header
–
4.3 m and 4.9 m (14 ft.
and 16 ft.) Header Shown (5.5 m [18 ft.] Header
Similar)
A - Reel Pressure
B - Knife and Conditioner Return
C - Case Drain
D - Knife and Conditioner Pressure
10. Push hose connectors onto mating receptacles as shown
until collars on receptacles snap into lock position.
NOTE:
Hoses attached to connectors not shown in illustrations
at right.