Lucent Technologies Lineage
®
2000 125A Ferroresonant Rectifier J85502C-1
2 -
Issue 8 July 1999
Installing or Adding a Rectifier
Installing Plant Control Cable Assembly for a Lucent
Converting AC Voltage (Optional)
Converting DC Output Polarity (Optional)
Initial Battery Charging (Optional)
Battery Plant Simulator Test Set
Preparation for Testing Off Line
Regulation (NL/FL) Test (Off Line)
Rectifier Failure Alarm/Fuse Alarm Test (Off Line)
Backup High Voltage Shutdown (HVSD) Test (Off
Selective High Voltage Shutdown (SHVSD) and
Meter Calibration Test (Off Line)
Float Equalize Setup and Test - Optional (Off Line)
Test for 434A or 434B Circuit Module
Bringing the Rectifier On Line
Regulation (NL/FL) Test (On Line)
Rectifier Failure Alarm/Fuse Alarm Test (On Line)