Lucent Technologies Lineage
®
2000 125A Ferroresonant Rectifier J85502C-1
5 - 12 Installation
Issue 8 July 1999
controller. The back of the controller has sixteen 24-pin
connectors labeled Rect 1 through Rect 16.
• For Expandable Controlled System (XCS) plants, open
the front panel and thread the control cable through the
hole in the wall of the controller. There are six 16-pin
connectors labeled Rect 1 through Rect 6.
• For Evolutionary Control System (ECS) 6U plants, open
the front panel and thread the control cable through the
slot inside the controller. On the backplane of the lower
panel on the controller there are six 40-pin connectors
labeled Rect 1 through Rect 6.
6. Plug the cable into the connector assigned to the rectifier
number determined in Step 4 above. This action will cause
a minor alarm in an MCS controller. For a Galaxy
controller, the rectifier position used must be programmed
per instructions found in the Galaxy controller product
manual.
7. Dress and tie down the cable to provide stress relief at the
connector.
The rectifier is now installed. The last three sections in this
chapter are optional procedures that may be needed at
installation. If not, proceed to Section 6, “Testing.”
Converting AC
Voltage
(Optional)
Converting the ac input voltage to a rectifier is necessary only if
the ac wiring is incorrect in the unit or if rectifiers are moved and
the input ac voltage is different. Refer to Figure 5-2 during this
procedure.
Warning
Remove the REG fuse associated with the rectifier from the
controller.
DANGER
This procedure MUST be performed ONLY on a rectifier that
is completely disconnected from the battery and plant bus
AND with ac power disconnected at the ac service panel.