426006-2304-013-B1
Lightscape Networks Ltd. Proprietary
4-1
Mechanical Installation
4.1 General
The mechanical installation of
µ
SDM-1 multiplexers consists of the following:
♦
Unpacking and visual inspection
♦
Installing the strain relief holder
♦
Unit mounting
♦
Connecting and routing cables and optical fibers
4.2 Unpacking and Visual Inspection
1. Check that all the shipment cartons have been supplied sealed and
undamaged.
2. Use a short knife to open the cartons so as not to damage the internal
components.
3. Check the contents of the cartons according to the packing list attached to
each carton, A standard packing list is shown in Appendix B.
4. Check for loose parts or any visual damage to the rack, subrack and auxiliary
equipment.
5. Check the integrity of all connectors, wires and cables.
6. If any damaged or missing parts have been detected, notify the project
manager and your local Lightscape Networks representative.
CAUTION
:
Keep cards in their anti-static protection bags until
ready for use to prevent damage.