4.9 Multi V ITR result report
Follow the process.
Save html file
Multi V Start up Confirmation
Date
Person In
Charge
Company Name & Address
Telephone
Name
Installer
Consultant
Supervisor
Product
Model
Model
No.
Position
Outdoor Unit
Indoor Unit
HR Unit
Test Run Results
Operation Mode
%ITR_6
All IDU Operation
1 IDU Operation
STEP
%ITR_122
Check Items
Min.
Max.
Average
Min.
Max.
Average
OK/NG
Criterion For Judgment
Temp.
Condition
IDU Air Temp
20~30°C
ODU Air Temp
Indoor Unit
IDU pipe inlet Temp
IDU pipe outlet temp
IDU LEV Openess
Outdoor Unit
Pressure
High Pressure
3,600kPa
↓
(Cool)
2,300kPa
↓
(Heat)
Low Pressure
1,300kPa
↑
(Cool)
200kPa
↑
(Heat)
COMP
COMP Operate Combination
CT Value
ODU #1 Comp1
24A
↓
ODU #1 Comp2
ODU #2 Comp1
ODU #2 Comp2
ODU #3 Comp1
50°C ~ 100°C
ODU #3 Comp2
ODU #4 Comp1
ODU #4 Comp2
Discharge
Temp.
ODU #1 Comp1
ODU #1 Comp2
ODU #2 Comp1
ODU #2 Comp2
ODU #3 Comp1
ODU #3 Comp2
ODU #4 Comp1
ODU #4 Comp2
Main Voltage
R-phase
342~456 V
T-phase
Main Current
R-phase
20A
↓
T-phase
Discharge
Superheat
ODU #1
10°C ~ 50°C(Heat)
ODU #2
ODU #3
ODU #4
Suction
Superheat
ODU #1
0.5°C
↑
(Cool) 0.5°C~7°C
(Heat)
ODU #2
ODU #3
ODU #4
ODU LEV
Openness
ODU #1
ODU #2
ODU #3
ODU #4
Refrigerant Check
Main EEV Check
IDU EEV Check
Function