Commissioning
94
BCL 34
Leuze electronic
10
Commissioning
10.1
Measures to be performed prior to the initial commissioning
ª
Before commissioning, familiarise yourself with the operation and configuration of the
device(s)!
ª
Before switching on, recheck all connections and ensure that they have been properly
made.
Loading and Configuration of Modules
Gather the required modules for the BCL 34 in your PLC software and configure them as
necessary. Further information regarding the individual modules is provided in chapter
"PROFIBUS" on page 44.
Configuration examples together with the required modules and flow diagrams may be
found in chapter "Example configurations" on page 88.
Setting the device address
The device address is set via switches in the modular hood. For setting instructions refer
to chapter 7.3.
ª
Set the device address according to the address previously selected in the configura-
tion.
10.2
Function Test
"Power On" test
After connecting the operating voltage, the BCL 34 performs an automatic "Power On"
function test. Subsequently, the green LED lights up in the optics window of the BCL 34.
Interface
A red/green LED for checking the interface function is located on the underside of the
modular hood. The significance of the individual LED states may be found in table 5.2 on
page 18.
Problems
Should a problem persist after checking all electrical connections and settings on the
devices and host, please contact a Leuze service office near you (see the back page of this
operating manual).
Summary of Contents for BCL34
Page 1: ...BCL34 Barcode reader GB 05 10 08 50038851 T E C H N I C A L D E S C R I P T I O N...
Page 98: ...Appendix 96 BCL 34 Leuze electronic 12 Appendix 12 1 EU Declaration of Conformity...
Page 102: ...Index 100 BCL 34 Leuze electronic V Vibration 18 W Warm up time 18 Warning notices 8 Weight 17...