![Lennox HYDROCONTROL Installation, Operating And Maintenance Manual Download Page 28](http://html1.mh-extra.com/html/lennox/hydrocontrol/hydrocontrol_installation-operating-and-maintenance-manual_1877200028.webp)
-27-
HYDROCTROL-IOM-1903-E
OPERATING
Associate FCU with schedules:
Once the different schedules are created you must associate them with the fan coils. To access the page you must go to the FCU
menu and click on the Time button:
Buttons:
-
Welcome: To return to the home page
-
Next: To access the next page with the next FCUs
-
Prev: To access the previous page with the previous FCUs
Each circle column represent the dedicated fan coil which is named at its top. Click on the desired circle which correspond to a
unique line (A,B,C,
…) to associated the FCU with the corresponding schedule (A,B,C,…). The green point shows which schedule is
associated to the fan coil.
/!\ If you click on multiple circle to quickly the green button can move back to its previous position for 2-3 seconds. Wait 5-10
seconds before leaving the screen to be sure the changes have been realized correctly.
Multi temp view
The multi temp view allows you to see all the controlled temperature (return, room,
…) from each fan coil connected to the
Hydrocontrol. To access it click on the button Multi temp from the FCU menu (See Fan coil screens Paragraph). The name and the
temperature of all the fan coils set in the HMI are shown in this view.
Picture45: Home page
Picture46: FCU menu
Picture47: Associate the FCU to the schedule
Picture48: Multi temp view