![Lauda Viscotemp 15 G Operation Manual Download Page 28](http://html1.mh-extra.com/html/lauda/viscotemp-15-g/viscotemp-15-g_operation-manual_4122547028.webp)
28 / 134
ECO Gold
Connection tube LZM 045
Screw for adjustment (3x)
Side view
Top view
Starting up of the calibration thermostat
Firstly, assemble the connecting tube LZM 045 as per diagram.
Attention! Do not bend the tube! Hold up with open-end wrench SW 14 mm.
Please move the connecting screws for adjustment of the cylindrical chamber
always gradually (about 2 rotations). Adjust the working chamber as per diagram,
and fix it that way it rises 3 mm above the bath opening. Refill the bath liquid
only up to 15 mm underneath the bath opening and only at working tempera-
ture and switched-off pump.
Recommendation for the adjustment of
the cylindrical working chamber
Level
pump off
Level
pump on
Summary of Contents for Viscotemp 15 G
Page 77: ...11 Declaration of Conformity 09 2021 ECO Gold 77 134 ...
Page 78: ...78 134 ECO Gold 09 2021 ...
Page 81: ...09 2021 ECO Gold 81 134 W Warnings 53 92 X Xp 106 Xpf 108 ...
Page 82: ...82 134 ECO Gold 09 2021 ...
Page 83: ...09 2021 ECO Gold 83 134 ...
Page 84: ...84 134 ECO Gold 09 2021 ...
Page 85: ...09 2021 ECO Gold 85 134 Appendix with settings ...
Page 121: ...09 2021 ECO Gold 121 134 Click on the tab with the mouse and then on the Device manager ...
Page 129: ...09 2021 ECO Gold 129 134 ...
Page 130: ...130 134 ECO Gold 09 2021 ...
Page 131: ......