Control Panel Installation
Refer to Figure 1-25:
1.
Start by routing the throttle and choke cable though
the top of the fuel tank and out the opening in the
bottom of the cavity in the fuel tank.
2.
Route the throttle cable and choke cable along the
frame and between the bumper and engine, do not
connect to the engine at this time.
Refer to Figure 1-26:
3.
Connect the electrical connectors to the control
panel. See the “Main Harness Wiring Schematics”
on page 25 of the manual for more information on
correct connections.
4.
Secure control panel to the fuel tank with cross head
bolts. Tighten bolts until snug against the control
panel.
Refer to Figure 1-27:
5.
Connect the throttle and choke cable to engine as
per engine specifications, see engine manual for
more information on correct engine set up.
6.
Attach the throttle and choke cable to the engine
clamps allowing for enough slack to adjust correctly.
7.
Secure the throttle and choke cables to the frame
with plastic zip ties to prevent the cables from binding
or rubbing.
8.
Test cable operation for binding or dragging of
cables.
NOTE: Mark the ends of each cable to identify
when connecting to the engine.
NOTE: Ensure that all connectors are spaced and
firmly connected.