3
6. REPAIR AND REPLACEMENT...................................................................................................22
6.1 LIGHTED FRONT DISPLAY................................................................................................22
6.2 DOOR REMOVAL/REPLACEMENT...................................................................................22
6.3 DOOR BOARD REMOVAL/REPLACEMENT......................................................................22
6.4 ELECTRONIC LIGHT BOARD REMOVAL/REPLACEMENT..............................................22
6.5 DOOR LATCH SOLENOID REMOVAL/REPLACEMENT....................................................23
6.6 DOOR SEAL REMOVAL/REPLACEMENT.........................................................................23
6.7 GAS STRUT REMOVAL/REPLACEMENT..........................................................................23
6.8 CONDENSER FAN MOTOR REMOVAL/REPLACEMENT.................................................23
6.9 AGITATOR MOTOR REMOVAL/REPLACEMENT..............................................................23
6.10 ICE BANk CONTROLLER REMOVAL/REPLACEMENT.....................................................24
6.11 TOP COVER REMOVAL/REPLACEMENT.........................................................................24
6.12 REFRIGERATION DECK REMOVAL/REPLACEMENT......................................................24
6.13 SOLD OUT SENSOR REMOVAL/REPLACEMENT............................................................25
6.14 PRODUCT CHAMBER CIRCULATION FAN REMOVAL/ REPLACEMENT.......................25
6.15 WATER CALIBRATIONS VALVE/FLOW WASHER REMOVAL/ REPLACEMENT.............26
6.16 NOZZLE REMOVAL/REPLACEMENT................................................................................26
6.17 ELECTRONICS REMOVAL/REPLACEMENT...............................................................26-27
6.18 STEPPER MOTOR REMOVAL/REPLACEMENT...............................................................27
6.19 WRAPPER REMOVAL/REPLACEMENT............................................................................27
7. TROUBLESHOOTING................................................................................................................28
7.1 REFRIGERATION SYSTEM...............................................................................................28
7.2 RESET TO FACTORY DEFAULTS.....................................................................................28
7.3 TROUBLESHOOTING GUIDE...........................................................................................29
8. DISPENSER DISPOSAL.............................................................................................................29
9. ILLUSTRATIONS, PARTS LISTINGS, WIRING AND WATER FLOW DIAGRAMS...................30
9.1 2-VALVE INSULATED TANK ASSEMBLY...........................................................................30
9.2 4-VALVE INSULATED TANK ASSEMBLY...........................................................................31
9.3 2-VALVE PUMP PLATFORMS/FAN PLATE ASSEMBLY...............................................32-33
9.4 4-VALVE PUMP PLATFORMS/FAN PLATE ASSEMBLY...............................................34-35
9.5 2-VALVE ELECTRICAL COMPONENT DETAIL.................................................................36
9.6 4-VALVE ELECTRICAL COMPONENT DETAIL.................................................................37
9.7 2-VALVE CABINET ASSEMBLY..........................................................................................38
9.8 4-VALVE CABINET ASSEMBLY..........................................................................................39
9.9 2-VALVE PERIPHERAL COMPONENTS/FINAL ASSEMBLY.............................................40
9.10 4-VALVE PERIPHERAL COMPONENTS/FINAL ASSEMBLY.............................................41
9.11 2-VALVE COMPRESSOR DECK ASSEMBLY...............................................................42-43
9.12 4-VALVE COMPRESSOR DECK ASSEMBLY...............................................................44-45
9.13 2-VALVE AND 4-VALVE DOOR ASSEMBLY..................................................................46-47
9.14 2-VALVE TOP COVER ASSEMBLY, DETAIL......................................................................48
9.15 4-VALVE TOP COVER ASSEMBLY, DETAIL......................................................................49
9.16 2-VALVE WATER FLOW DIAGRAM...................................................................................50
9.17 4-VALVE WATER FLOW DIAGRAM...................................................................................51
9.18 2-VALVE WIRING DIAGRAM..............................................................................................52
9.19 4-VALVE WIRING DIAGRAM..............................................................................................53