3-182
Enhancement device setup procedure > Optional device installation
[CONFIDENTIAL]
129
Put back the inner cover to the original position (Screw x7). Screw was removed in
step 123.
130
Put back the rear cover to the original position (Screw x8). Screw was removed in
step 124.
131
Close the front cover.
132
Connect Bridge Kit (AK- 9120) [A] to Stacker (ST-9100) [B].
133
Open the front cover [A].
[A]
[B]
[A]