3-174
Enhancement device setup procedure > Optional device installation
[CONFIDENTIAL]
<I> Bridge Kit for Stacker to Finisher (AK-9120)
Preparation for 5000 Sheet Stacker (ST-9100) (Upstream Unit)
112
Attach bundled in AK-9120 2 positioning pins [A] to connecting plate right [B].
113
Remove upper left cover [A] (Screw x2). Cover [A] and screws will not be used again.
NOTE
• See
Bridge Kit for Stacker to Finisher (AK-9120)
for unpacking.
IMPORTANT
• All tapes and packing materials on the accessories parts have to be removed.
• Main power switch has to be turned off and power cable has to be unplugged before install AK-9120.
[A]
[B]
[A]
[A]