3-55
Enhancement device setup procedure > Optional device installation
[CONFIDENTIAL]
43
Open the front door of the paper feeder, and then fix the lock stay (Screw x1) and joint
bracket (Screw x1: M4x10). Screw is used in Step 36.
NOTE
• Machine level: Less than 5mm (0.2”) from level (measure from left-to-right and front-to-rear)
• Machine height: The paper feed port [A] of the paper feeder is positioned within the range of the paper feed
port [B] of the main machine
•