3-30
CHAPTER 3 MECHANICAL SYSTEMS
1.2.12 Removing the Stack delivery roller (lower)/Delivery Belt
1) Remove paddle assembly, and separate it
from the processing tray assembly. (See
1.2.4.)
2) Slide the aligning plate (front) [2] and
the aligning plate (rear) [3] of the pro-
cessing tray assembly [1] by sliding
them to the outside.
F03-102-49
3) Remove the processing tray stopper [4].
F03-102-50
4) Remove the screw [5], and detach the
paper guide (front) [7] while freeing the
two claws [6].
F03-102-51
[1]
[3]
[2]
[4]
[5]
[7]
[6]
Summary of Contents for DF-75
Page 1: ...SERVICE MANUAL Published in Aug 01 5FG70760 DF 75...
Page 12: ...CHAPTER 1 GENERAL DESCRIPTION...
Page 24: ...CHAPTER 2 OUTLINE OF OPERATION...
Page 89: ...CHAPTER 3 MECHANICAL SYSTEMS...
Page 132: ...CHAPTER 4 MAINTENANCE AND INSPECTION...
Page 135: ...CHAPTER 5 TROUBLESHOOTING...
Page 142: ...5 7 CHAPTER 5 TROUBLESHOOTING...
Page 145: ...5 10 CHAPTER 5 TROUBLESHOOTING 2 1 2 Motor PCBs M7 M8 M5 M4 M3 M6 M1 M2 1 F05 201 02...
Page 175: ...5 40 CHAPTER 5 TROUBLESHOOTING...
Page 176: ...APPENDIX...
Page 180: ...A 4...
Page 184: ...A 8 APPENDIX...
Page 198: ...A 22...