
6
. CYLINDER HEAD/CYLINDER/PISTON
6-5
SUPER8 50 2T
Cylinder Head Bolts Installation
Install and tighten the cylinder head bolts
diagonally in 2 or 3 times.
Torque
: 1.5
~
1.7kg-m
Install the spark plug.
Torque
: 1.1
~
1.7kg-m
Engine Hood Installation
Install the engine hood. (
Ö
6-3)
Install the spark plug cap. (
Ö
6-3)
Perform the following inspections after
installation:
•
Compression test
•
Abnormal engine noise
•
Cylinder air leaks
Cylinder head Bolts
Bolts
Cylinder Head
Spark Plug
Engine Hood
Summary of Contents for SUPER8 50
Page 19: ...2 GENERAL INFORMATION 2 16 SUPER8 50 2T PEOPLE S 50 WIRING DIAGRAM...
Page 49: ...4 LUBRICATION SYSTEM 4 1 SUPER8 50 2T LUBRICATION SYSTEM...
Page 61: ...6 CYLINDER HEAD CYLINDER PISTON 6 1 SUPER8 50 2T Torque 1 5 1 7kg m Torque 1 1 1 7kg m cold...
Page 96: ...9 FINAL REDUCTION 9 1 SUPER8 50 2T...
Page 105: ...10 CRANKCASE CRANKSHAFT 10 1 SUPER8 50 2T Torque 0 8 1 2kg m...
Page 114: ...11 CARBURETOR 11 1 SUPER8 50 2T...
Page 128: ...12 FRAME COVERS 12 1 SUPER8 50 2T ASSEMBLY DRAWING...