
12
. FRAME COVERS
12-5
SUPER8 50 2T
Remove the floor mat.
Remove the center cover. (
Ö
12-3)
Remove the screws and bolts attaching the
front right and left side covers.
Remove the four bolts attaching the floor-foot.
Remove the floor-foot.
The installation sequence is the reverse of
removal.
LEG SHIELD LOW REMOVAL
Remove the met-in box.
Remove the body cover.
Remove the floor-foot.
Remove the front upper cover.
Remove the eight screws attaching the leg
shield low.
Disconnect the leg shield low with the cowl
under cover.
The installation sequence is the reverse of
removal.
FRONT UPPER COVER REMOVAL
Remove the eight screws on the back of the
front upper cover.
Remove the bolt and two adjusting screws on
the front of the front upper cover.
Disconnect the signal light wire connector.
Remove the front upper cover.
The installation sequence is the reverse of
removal.
Screws
Leg Shield Low
Bolts
Screw
Front Cover
Bolts
Summary of Contents for SUPER8 50
Page 19: ...2 GENERAL INFORMATION 2 16 SUPER8 50 2T PEOPLE S 50 WIRING DIAGRAM...
Page 49: ...4 LUBRICATION SYSTEM 4 1 SUPER8 50 2T LUBRICATION SYSTEM...
Page 61: ...6 CYLINDER HEAD CYLINDER PISTON 6 1 SUPER8 50 2T Torque 1 5 1 7kg m Torque 1 1 1 7kg m cold...
Page 96: ...9 FINAL REDUCTION 9 1 SUPER8 50 2T...
Page 105: ...10 CRANKCASE CRANKSHAFT 10 1 SUPER8 50 2T Torque 0 8 1 2kg m...
Page 114: ...11 CARBURETOR 11 1 SUPER8 50 2T...
Page 128: ...12 FRAME COVERS 12 1 SUPER8 50 2T ASSEMBLY DRAWING...