
11
. CARBURETOR
11-10
SUPER8 50 2T
FLOAT CHAMBER ASSEMBLY
Install the main jet and needle jet holder.
Install the air screw and throttle stop screw
according to the rotations recorded.
Install the float valve, float and float pin.
Tighten the float screw securely.
FLOAT LEVEL INSPECTION
Slightly tilt the carburetor and measure the
float level with the float valve just
connecting the float arm.
Float Level
: 8.6mm
Replace the float if the level is out of the
specified level range.
Install the O-ring.
Check the operation of the float and install
the float chamber.
Tighten the screws.
If the air screw must be replaced, be
sure to perform the air screw
adjustment again.
*
Air Screw
Throttle Stop Screw
Needle Jet holder
Float Pin
Main Jet
Slow Jet
Summary of Contents for SUPER8 50
Page 19: ...2 GENERAL INFORMATION 2 16 SUPER8 50 2T PEOPLE S 50 WIRING DIAGRAM...
Page 49: ...4 LUBRICATION SYSTEM 4 1 SUPER8 50 2T LUBRICATION SYSTEM...
Page 61: ...6 CYLINDER HEAD CYLINDER PISTON 6 1 SUPER8 50 2T Torque 1 5 1 7kg m Torque 1 1 1 7kg m cold...
Page 96: ...9 FINAL REDUCTION 9 1 SUPER8 50 2T...
Page 105: ...10 CRANKCASE CRANKSHAFT 10 1 SUPER8 50 2T Torque 0 8 1 2kg m...
Page 114: ...11 CARBURETOR 11 1 SUPER8 50 2T...
Page 128: ...12 FRAME COVERS 12 1 SUPER8 50 2T ASSEMBLY DRAWING...