
6
. CYLINDER HEAD/CYLINDER/PISTON
6-4
SUPER8 50 2T
COMBUSTION CHAMBER
DECABONIZING
Remove the carbon deposits from the
combustion chamber
CYLINDER HEAD INSPECTION
Check the cylinder head for warpage with a
straight edge and feeler gauge.
Service Limit
:
0.10mm replace if over
CYLINDER HEAD INSTALLATION
Install the cylinder head on the cylinder
properly.
Install a new cylinder head gasket onto the
cylinder.
Avoid damaging the combustion cham-
ber wall and cylinder mating surface.
*
Be careful not to damage the mating
surfaces.
*
Cylinder head Gasket
Combustion Chamber
Mating Surface
Summary of Contents for SUPER8 50
Page 19: ...2 GENERAL INFORMATION 2 16 SUPER8 50 2T PEOPLE S 50 WIRING DIAGRAM...
Page 49: ...4 LUBRICATION SYSTEM 4 1 SUPER8 50 2T LUBRICATION SYSTEM...
Page 61: ...6 CYLINDER HEAD CYLINDER PISTON 6 1 SUPER8 50 2T Torque 1 5 1 7kg m Torque 1 1 1 7kg m cold...
Page 96: ...9 FINAL REDUCTION 9 1 SUPER8 50 2T...
Page 105: ...10 CRANKCASE CRANKSHAFT 10 1 SUPER8 50 2T Torque 0 8 1 2kg m...
Page 114: ...11 CARBURETOR 11 1 SUPER8 50 2T...
Page 128: ...12 FRAME COVERS 12 1 SUPER8 50 2T ASSEMBLY DRAWING...