
KW Aufzugstechnik GmbH OPERATING MANUAL DAVID-613
DAVID-D613-V125-E 13.04.2021
Page - 43 -
2.12 DESCRIPTION REMOTE STATION ER-2013
The remote station
ER-2013
provides 8 inputs and outputs, including 6 free
inputs and outputs. There are 2 piece-outputs for the call messaging of bus-
matrix-indicator.
The remote station has all necessary call-channels and arrow-outputs (even for
selective door-controlling)
The installation of Remote Station is in the standard shaft cable channel 90x40.
You combinate the Bus and Power only with blue connection cable RJ-45-
Cable.
The lower 7-pin plug with the call-messaging 2xA & 2xB is responsible for the
Door 1, the upper plug with 2xC & 2xD for the Door 2.
The two 10 pin ribbon cable connectors have the same functional assignments,
such as the green plug.
The matrix-indicator with RJ-12 cable are to put in the 2 black jacks.
The yellow marked RJ-12 jack for high-quality TFT graphic displays with KW-
bus connection.
RJ12-Bus Grey LEDMatrix
Bus- RJ-45 Blue
Bus- RJ-45 Blue
GND 0V
500
TFT
200 Controler V24V
Landing Call D1 Up
2xA
RJ-
12
PZ2 Piezo Buzzer D2 / A2
Landing Call D1 Down
2xB
98B Arrow Indicat. A2 Down
Arrow Indicat. A1 Up
97A
Remote Station ER-2013
97B Etagenpfeil T2 Auf
Arrow Indicat. A1 Down
98A
2xD Landing Call D2 Down
Piezo Buzzer D1 / A1
PZ1
2xC Landing Call D2 Up
Controler V24V
200
500 GND 0V
Terminal
Function
2xA
Landing Call Door 1 Up
2xB
Landing Call Door 1 Down
2xC
Free: for example
Landing Call Door 2 Up
at selective D
2xD
Free: for example
Landing Call Door 2 Down
at selectiv
97A
Free: for example
Level Arrow Door 1 Up
98A
Free: for example
Level Arrow Door 1 Down
97B
Free: for example
Level Arrow Door 2 Up
98B
Free: for example
Level Arrow Door 2 Down
500
GND
200
Controller V24V
On the remote station ER-2014 is a 2-pole DIL switch for activating functions.
1. Switch-1 can be used to switch on termination. The termination is only to be activated for the
last floor computer on the bus.
2.The passive bus is activated on switch-2. A passive bus can only output information, e.g. Arrows
and cabin stand. It therefore operates in the same address space as the Shaftbus-1.
Summary of Contents for DAVID 613
Page 1: ...OPERATING MANUAL LIFT CONTROLLER SYSTEM DAVID 613 FUNCTIONS START UP INSTRUCTIONS...
Page 2: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 2...
Page 10: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 10...
Page 12: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 12...
Page 13: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 13...
Page 14: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 14...
Page 34: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 34...
Page 35: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 35...
Page 98: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 98...