
KW Aufzugstechnik GmbH OPERATING MANUAL DAVID-613
DAVID-D613-V125-E 13.04.2021
Page - 240 -
6. Insert the steel band through
the side opening on the reader.
Check the correct alignment of the
holes using the marks on the
reader.
7. Push the sliding jaw through the
opening with the notch intended
for the steel strip.
8
.
Insert the aluminum strip from
top to bottom into the slot pro-
vided for this purpose.
9.
Please mount the reader
7
on
the holder
6
provided.
Up to 3
screws are available.
10
.
The holder with the reading
head is mounted on the cabin roof
with the
4 screws
provided.
11.
Check the correct assembly.
The tape should be installed as
vertically and straight as possible.
Deviations and angular misalign-
ments must be corrected. Other-
wise the sliding jaws will be dam-
aged!
12
. Switch the car computer off
with the switch
S37
FKR at the in-
spection box.
13.
The plug of the Kübler LES02
read head can be plugged into the
ASE unit when de-energized.
Subsequently, the switch
S37
can
be switched on again.
Summary of Contents for DAVID 613
Page 1: ...OPERATING MANUAL LIFT CONTROLLER SYSTEM DAVID 613 FUNCTIONS START UP INSTRUCTIONS...
Page 2: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 2...
Page 10: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 10...
Page 12: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 12...
Page 13: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 13...
Page 14: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 14...
Page 34: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 34...
Page 35: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 35...
Page 98: ...KW Aufzugstechnik GmbH OPERATING MANUAL DAVID 613 DAVID D613 V125 E 13 04 2021 Page 98...