93
5.4
Calibrating electronic level indicator
Step 6.
Switch off the agitation system. (This is to prevent movements in
the tank when the tank is almost empty)
Step 7.
Open the main valve on the FMC control box.
Step 8.
Check if the liters on the ASV screen starts to run.
Step 9.
Look inside the tank and switch of the main valve when the float is
touching the bottom.
(Advice take the box in your hand on the sprayer or ask an extra
person)
Step 10.
After switching of the main valve the following message will
appear
Step 11.
Confirm with the OK bottom
Extra added function:
When during the process something is gowning wrong. Push the
botton.
The calibration function has now stopped (sprayer is still spraying)
Switch the main valve and the control box and after 5 second
start it up again. The previous calibration value is now still inside
the box. And calibration steps can be activated again.
Summary of Contents for TS-T
Page 5: ...1 2 EC connections 5 For more information please also check the inside of the PCB housing ...
Page 13: ...13 2 2 Standard Splitterbox connections ...
Page 17: ...17 2 3 SHC Box input connections ...
Page 35: ...35 2 4 8 Total overview SHC hydraulic section ...
Page 38: ...38 2 5 2 2 SHC boxes hydraulics 2 5 3 2 SHC Boxes water sections ...
Page 45: ...45 2 7 1 ASV system overview Fuse inside Fuse inside ...
Page 55: ...55 3 3 Cable and sensor test 3 3 1 Speed sensor machine and flow sensor test Metal ...
Page 56: ...56 3 3 Cable and sensor test 3 3 Locking sensor test ...