This guide for use by qualified personnel only.
Installing the Inverter/Charger
Overview
This section provides detailed information on installing the
$XWR3RZHU
.
The overall procedure is divided into eight steps:
Step 1: Choosing a Location for the Inverter/Charger on page 2
Step 2: Mounting the Inverter/Charger on page 2
Step 3: Connecting the AC Input and AC Output Wires on page 2
Step 4: Connecting the DC Cables on page 3
Step 5: Connecting the Battery Temperature Sensor (BTS) on page 3
Step 6: Connecting to the Network on page 4
Step 7: Performing Checks Prior to Initial Start-Up on page 4
Step 8: Testing Your Installation on page 4
Summary of Contents for 091-269-12-2000
Page 2: ......
Page 31: ...1 Blank Page for future use...