Planning Preparations
This guide for use by qualified personnel only.
Figure 4
Wiring and Breakers Block Diagram for
$XWR3RZHU
"1
Inverter/Charger
120 V AC OUT
120 V AC IN
Battery (Bank)
12
7
switch
HOT = BLACK
NEUTRAL = WHITE
GND = GREEN/Bare
HOT BUS
TO AC APPLIANCE
LOADS
INVERTER AC SUB PANEL (TYPICAL)
MAIN ELECTRICAL PANEL
FROM SHORE OR
GENERATOR POWER
OPTIONAL
GFCI duplex receptacle special kit
15 A output limit
HARDWIRE CONNECTIONS
30 A MAX in pass-through
Neutral
GND
15 A
20 A
Neutral
GND
30 A
MAIN
As per ABYC E-11, DC fuses are required 7 inches from the positive terminal of the
battery and another from the positive terminal of the charger. A DC Switch is
recommended on the battery side as well.
For Marine applications see NOTE below.
NOTE: The DC grounding conductor may be one size smaller than the minimum size conductor
required for the DC current carrying conductors providing the overcurrent protection device in the
DC positive conductor is rated no greater than 135% of the ampacity of the DC grounding
conductor and the conductor is no smaller than 16 AWG.
IMPORTANT:
Read
Installation
Guides
prior
to
installation.
Always
refer
to
local
and
national
electrical
codes
for
proper
wire
and
breaker
sizes
prior
to
installation.
Summary of Contents for 091-269-12-2000
Page 2: ......
Page 31: ...1 Blank Page for future use...