Kurz
B
‐
Series
Operations
Guide
5–
3
Extended Utilities Mode
The
following
example
runs
the
zero
drift
check
after
entering
Extended
Utilities
mode.
Enter UTL Option
1-5>1
1>
Use
the
numeric
keys
to
enter
1
,
and
then
press
E
.
The
prompt
appears
to
confirm
starting
the
drift
check
test.
ZERO DRIFT CHECK
START TEST> YES
2>
Press
the
arrow
keys
to
select
YES
,
and
then
press
E
.
The
display
indicates
that
the
test
is
running.
ZERO DRIFT CHECK
IS RUNNING...
When
the
test
completes,
the
display
shows
the
percent
difference
between
the
voltage
input
and
voltage
output
for
the
zero
drift
check.
ZERO DRIFT CHECK
%DIFF = 1.091
After
3
seconds,
the
display
shows
the
voltage
input
and
output
values
used
in
the
zero
drift
check.
Vin = 0.33000 V
Vout= 0.33360 V
Note
If
you
select
NO
when
prompted
to
start
the
drift
check,
the
percent
difference
between
voltage
input/output
and
the
voltage
input/output
values
for
the
last
drift
check
appear.
3>
Press
E
or
C
to
return
to
the
Extended
Utilities
mode
option
prompt.
Summary of Contents for 410FTB
Page 1: ...Operations Guide for B Series Flow Meters 368042E...
Page 4: ...Kurz B Series Operations Guide iv...
Page 9: ...Kurz B Series Operations Guide ix Preface...
Page 33: ...Kurz B Series Operations Guide 1 20 B Series Flow Meter Modes Menus...
Page 65: ...Kurz B Series Operations Guide 2 32 B Series Flow Meter Display Mode Options...
Page 141: ...Kurz B Series Operations Guide 4 68 Program Mode Advanced Setup...