
Seapath 320
48
M300-62/rev.2
9
Inspect the logged calibration data (in the file "Seapath.cal") for any wild points
by selecting the command
Show graph
. Correct the wild points found or delete
the whole line(s) and perform a recalculation of the calibration data.
10
When the Seapath calibration result has been found acceptable, click
Next
to
proceed to page 4. Input the mean value for the vessel heading reference, in this
example logged on a separate PC and found to be 160.00 degrees, and click on
Compute
in order to calculate the heading offset.
Figure 20 Page 4 of antenna calibration wizard
11
Click
Finish
to accept the result and exit the antenna calibration wizard.
3.4.4.3
Calibration of MRU axis
After the mechanical installation is completed, the MRU R, P and Y axes must be
aligned to the corresponding vessel axes or the axes of the system to be compensated.
To achieve the MRU's specified roll and pitch accuracy, any misalignment of the MRU
axes with the vessel axes must be precisely calculated and accounted for. The MRU
axes, and particularly the yaw axis, must be aligned with the vessel axes with an
accuracy better than 0.5 degrees to ensure that the MRU functions are according to
specifications. For multibeam echo sounder applications an accuracy better than 0.1
degrees is required to ensure satisfactory performance.
Summary of Contents for Seapath 320
Page 1: ...Seapath 320 Installation Manual ...
Page 20: ...Seapath 320 4 M300 62 rev 2 ...
Page 42: ...Seapath 320 26 M300 62 rev 2 ...
Page 98: ...Seapath 320 82 M300 62 rev 2 ...
Page 100: ...Seapath 320 84 M300 62 rev 2 5 1 Processing and HMI Units ...
Page 101: ...Installation Manual M300 62 rev 2 85 ...
Page 102: ...Seapath 320 86 M300 62 rev 2 5 2 Antenna bracket ...
Page 103: ...Installation Manual M300 62 rev 2 87 5 3 MRU and mounting bracket ...
Page 104: ...Seapath 320 88 M300 62 rev 2 ...
Page 105: ...Installation Manual M300 62 rev 2 89 5 4 MRU junction box ...
Page 107: ...Installation Manual M300 62 rev 2 91 5 6 6 U cabinet dimensions ...
Page 108: ...Seapath 320 92 M300 62 rev 2 ...
Page 126: ...Seapath 320 110 M300 62 rev 2 ...
Page 127: ...Installation Manual M300 62 rev 2 111 ...
Page 128: ...Seapath 320 112 M300 62 rev 2 ...
Page 129: ...Installation Manual M300 62 rev 2 113 ...
Page 130: ...Seapath 320 114 M300 62 rev 2 ...
Page 133: ...Installation Manual M300 62 rev 2 117 APPENDIX D COAX CABLE SPECIFICATION ...
Page 134: ...Seapath 320 118 M300 62 rev 2 ...
Page 135: ...Installation Manual M300 62 rev 2 119 APPENDIX E RG 214 SPECIFICATIONS ...
Page 136: ...Seapath 320 120 M300 62 rev 2 ...
Page 152: ...Seapath 320 136 M300 62 rev 2 ...