If available, connect the signal cables with DGNSS correction and external gyro
compass to free terminals at the rear of the Processing Unit.
12
Connect an Ethernet cable from the LAN port on the rear of the Processing Unit
and the HMI Unit to the network onboard the vessel or a direct connection
between the two units.
13
When all cables are connected, power on the Processing and HMI Units, the four
LED indicators located on the front panel of the Processing Unit should then start
to shine red. The LED1 light diode in the MRU junction box should then shine
green indicating that the MRU receives power. A yellow light in LED2 indicates
that digital data are sent from the MRU on TX+.
14
If the software starts on both the Processing and the HMI Unit, the installation is
now completed and the setup of the configuration parameters can continue.
3.4.3
Setup of configuration parameters
Setup consists of:
Entering lever arm vectors and mounting angles for the MRU and the GNSS
antennas in the NavEngine configuration of the operator software.
Entering input and output data interface in the NavEngine configuration of the
operator software.
The setup parameters are entered into the operator software on the HMI Unit.
See chapter 4.1. for a description of the operator software.
3.4.3.1
Lever arm vector determinations
The following lever arm vectors have to be determined and input to the operator
software:
The vector from the selected AP to the GNSS antenna no. 1.
The vector from the selected AP to the MRU location.
The vectors from the selected AP to each of the monitoring points (maximum eight
MPs).
All these vectors have to be measured or calculated based upon drawings or previously
measured points. These vectors are to be measured within an accuracy described in
chapter 3.3.5. Positive vector orientation for these parameters is X - positive forwards,
Y - positive towards starboard, Z - positive downwards with the AP (Aft Perpendicular)
as the origin.
Summary of Contents for Seapath 320
Page 1: ...Seapath 320 Installation Manual ...
Page 20: ...Seapath 320 4 M300 62 rev 2 ...
Page 42: ...Seapath 320 26 M300 62 rev 2 ...
Page 98: ...Seapath 320 82 M300 62 rev 2 ...
Page 100: ...Seapath 320 84 M300 62 rev 2 5 1 Processing and HMI Units ...
Page 101: ...Installation Manual M300 62 rev 2 85 ...
Page 102: ...Seapath 320 86 M300 62 rev 2 5 2 Antenna bracket ...
Page 103: ...Installation Manual M300 62 rev 2 87 5 3 MRU and mounting bracket ...
Page 104: ...Seapath 320 88 M300 62 rev 2 ...
Page 105: ...Installation Manual M300 62 rev 2 89 5 4 MRU junction box ...
Page 107: ...Installation Manual M300 62 rev 2 91 5 6 6 U cabinet dimensions ...
Page 108: ...Seapath 320 92 M300 62 rev 2 ...
Page 126: ...Seapath 320 110 M300 62 rev 2 ...
Page 127: ...Installation Manual M300 62 rev 2 111 ...
Page 128: ...Seapath 320 112 M300 62 rev 2 ...
Page 129: ...Installation Manual M300 62 rev 2 113 ...
Page 130: ...Seapath 320 114 M300 62 rev 2 ...
Page 133: ...Installation Manual M300 62 rev 2 117 APPENDIX D COAX CABLE SPECIFICATION ...
Page 134: ...Seapath 320 118 M300 62 rev 2 ...
Page 135: ...Installation Manual M300 62 rev 2 119 APPENDIX E RG 214 SPECIFICATIONS ...
Page 136: ...Seapath 320 120 M300 62 rev 2 ...
Page 152: ...Seapath 320 136 M300 62 rev 2 ...