MAINTENANCE
SERVICE PROCEDURE
4-31
If bolt (2) and nut (1) are damaged, replace them with new
ones at the same time.
Loosen nut (1) remove bolt (2), then replace or turn.
6.
Install the cutting edge on the blade and tighten the bolt
temporarily. Press the blade against the ground to elimi-
nate the play of bolt (2), then tighten the bolt to the speci-
fied torque.
7.
When installing end bit (3), put top face (4) of the end bit in
tight contact with stopper (5), then tighten the bolt.
8.
After several hours of running, retourque the nuts.
Summary of Contents for 76243
Page 2: ......
Page 3: ...FOREWORD 11 ...
Page 5: ...FOREWORD FOREWORD 1 3 q Machine equipped without cab Back pocket of operator s seat ...
Page 16: ...NECESSARY INFORMATION FOREWORD 1 14 ...
Page 17: ...FOREWORD NECESSARY INFORMATION 1 15 ...
Page 24: ...CONTENTS 1 22 ...
Page 28: ...SAFETY LABELS SAFETY 2 4 SAFETY LABELS 2 POSITIONS OF SAFETY PICTOGRAMS 2 ...
Page 289: ...SPECIFICATIONS 15 ...
Page 297: ...INDEX 17 ...
Page 298: ...INDEX 7 2 ...
Page 301: ...COLOPHON 18 ...