![KLS Martin IDP 101 S air plus Mounting Instructions Download Page 6](http://html.mh-extra.com/html/kls-martin/idp-101-s-air-plus/idp-101-s-air-plus_mounting-instructions_1978996006.webp)
Suspension Arm Systems Independant
6
Revision 1
Installing the Cables for the Gas Supply and Exhaust Air ..................................... 71
Gas Type Check (M6 Service Head only) ........................................................... 74
Mounting the Canopy, Cover Caps and Claddings .................................... 75
Installing/Uninstalling the Cover Caps on the Extension Arm ................................ 79
Mounting the Side Cladding on the Spring Arm .................................................. 82
Mounting the Lower Rear Cover Panels on the Spring Arm ................................... 83
Mounting the Front Side Claddings on the Spring Arm ......................................... 84
Mounting the Upper Front Cover Panel on the Spring Arm ................................... 85
Adjustment Work ....................................................................... 86
Safety Notice for Adjustment Work ........................................................ 86
Adjusting the Mechanical Brake for the M6 service head .......................... 86
Selecting the Load-Bearing Capacity on the Spring Arm ........................... 87
Adjusting the Vertical Lift on the Spring Arm .......................................... 91
Correcting the Vertical Alignment of the M6 Service Head ........................ 93
Swivel Stop on the Extension Arm and Spring Arm .................................. 94
Technical Specification ................................................................ 98
Dimensional Drawings ......................................................................... 98
Spring Arm, IDP 101 S air plus, Single Arm, with M6 Service Head ....................... 98
Spring Arm, IDP 101 S air plus, Dual Arm, with M6 Service Head ......................... 99
Permissible Adaptions ........................................................................ 102
Inspection Plan ........................................................................ 103
Ecological Information .............................................................. 105
Disposal of the Device ....................................................................... 105