![KLS Martin IDP 101 S air plus Mounting Instructions Download Page 13](http://html.mh-extra.com/html/kls-martin/idp-101-s-air-plus/idp-101-s-air-plus_mounting-instructions_1978996013.webp)
Suspension Arm Systems Independant
Revision 1
13
Longer ceiling tube
−
1 ceiling tube (customized length)
−
1 earthing cable 4 mm²
Included components
−
1 socket wrench extension (only for ceiling tube lengths 500 and 700 mm)
Fastening elements for additional ceiling tube
−
8 Allen cylinder screws M10 x 25 mm (8.8) DIN EN ISO 4762
−
8 retaining washers S10
For pre-assembly, see section 7.2 “Pre-assembly: Mounting the Longer Ceiling Tube on the
Extension Arm”, page 43.
Console tube
−
1 console tube (customized length)
Pre-installed components
−
1 earthing cable 4 mm²
Fastening elements for service head
−
8 countersunk screws with hexagon socket M10 x 20 mm (10.9) DIN EN ISO 10642
Fastening elements for installation of console tube to M6 service head:
−
in scope of delivery of M6 service head
For assembly, see section 7.4 “Mounting the Console Tube on the Spring Arm”, page 55.