Facing Material Installation Guide
The entire Facing Material for this unit may either be of combustible or non-combustible material. It
is recommended that the Facing be installed after the unit is secured in its framing and properly
vented. A cutout profile for this unit is shown in the Dimensional Overview section.
NOTE: Only one 2x4 stud/header may be used in the frame. Please refer to Figure 5 on page
1
0
or Figure 11 below.
To ensure the Front Surround covers the maximum area of the cutout, it is recommended that the
upper corners of the cutout be rounded with a 1” to 2” [25.4mm to 50.8mm] radius. This is shown
in Figure 12.
Figure 11 - Installation guide for 1/2" facing material.
Figure 12 - Recommended 1" to 2" radius on upper corner of facing material cutout.
15
Summary of Contents for Marquis Serenity MQZDV1917
Page 10: ...General Framing Installations Figure 5 General framing installation 10...
Page 31: ...Gas Conversion for Modulator PART C WARNING WARNING 31...
Page 34: ...Configuration 1 Basic manual HI LO and manual ON OFF capabilities 34...
Page 35: ...Receiver Module 584 523 521 221 1001 P221SI Receiver Module 584 523 521 221 1001 P221SI 35...