Installation
61 / 264
03/2015
3.7.3 Fixing / connecting the control unit for redundant valve
(Option, position 40 in Fig. [9])
• Install FKA Standard control unit <4> in accordance with the instructions enclosed with this unit.
• Fit a cable duct next to the cable duct <g> on the main control unit (Comfort PLUS) <1>.
• Establish an electrical connection between the FKA Standard control unit <4> and the main control unit <1>,
to do this:
Connect the connection cable <2> pre-fitted to the control unit for the Ecolift XL redundant valve to the main
control unit as follows:
Main control unit terminals <3>
Colours of the connection
cables <2>
w
white
bk
black
bl
blue
• Connect the optical probe of the redundant valve (yellow cable marking) <5> to the FKA Standard control unit
<4> (connection with yellow marking).
3
1
4
2
5
Abb. [34]
Summary of Contents for 010-694
Page 42: ...42 264 Leistungserkl rung DOP 03 2015 9 Leistungserkl rung DOP...
Page 43: ...Leistungserkl rung DOP 43 264 03 2015...
Page 86: ...86 264 Declaration of conformity 03 2015 9 Declaration of conformity...
Page 87: ...Declaration of conformity 87 264 03 2015...
Page 129: ...D claration de conformit 129 264 03 2015 9 D claration de conformit...
Page 130: ...130 264 03 2015...
Page 131: ...131 264 03 2015...
Page 173: ...Dichiarazione di conformit 173 264 03 2015 9 Dichiarazione di conformit...
Page 174: ...174 264 Dichiarazione di conformit 03 2015...
Page 175: ...175 264 03 2015...
Page 218: ...218 264 Conformiteitsverklaring 03 2015 9 Conformiteitsverklaring...
Page 219: ...Conformiteitsverklaring 219 44 03 2015...
Page 261: ...Dane techniczne 261 264 03 2015...
Page 262: ...262 264 Deklaracja zgodno ci 03 2015 9 Deklaracja zgodno ci...