52 / 264
Introduction
03/2015
1.5
Scope of delivery
Check the system and all components supplied for any faults
1.5.1 Ecolift version
11 FKA Standard control unit for Ecolift XL redundant valve with
separate installation instructions*
12 Small compressor for air bubble formation with installation
instructions*
13 Installation instructions
14 Comfort PLUS control unit with separate installation
instructions
17 Connection diagram, in the control unit housing cover
18 Fastening material for the control unit
19 Drilling template for the control unit
20 System tank (base element of the chamber system)
23 Wastewater pump(s*)
24 Adapter for optical probe for redundant valve* (yellow).
25 Optical probe(s*)
54 Passage seal for ventilation pipe
* Option
13
20
54
23
25
24
Abb. [26]
12
11
19
Abb. [27]
Summary of Contents for 010-694
Page 42: ...42 264 Leistungserkl rung DOP 03 2015 9 Leistungserkl rung DOP...
Page 43: ...Leistungserkl rung DOP 43 264 03 2015...
Page 86: ...86 264 Declaration of conformity 03 2015 9 Declaration of conformity...
Page 87: ...Declaration of conformity 87 264 03 2015...
Page 129: ...D claration de conformit 129 264 03 2015 9 D claration de conformit...
Page 130: ...130 264 03 2015...
Page 131: ...131 264 03 2015...
Page 173: ...Dichiarazione di conformit 173 264 03 2015 9 Dichiarazione di conformit...
Page 174: ...174 264 Dichiarazione di conformit 03 2015...
Page 175: ...175 264 03 2015...
Page 218: ...218 264 Conformiteitsverklaring 03 2015 9 Conformiteitsverklaring...
Page 219: ...Conformiteitsverklaring 219 44 03 2015...
Page 261: ...Dane techniczne 261 264 03 2015...
Page 262: ...262 264 Deklaracja zgodno ci 03 2015 9 Deklaracja zgodno ci...