A
A (1 : 5)
E
E (1 : 5)
INSTALL BLOCK CONNECTOR CW IN RAIL
LONGITUDINAL DIRECTION
3a
of 9
Adjust thermal rail joint spacing of the two SpeedRails to
50mm up to 80 mm. Position the Block Connector CW
onto the two-speed rails. Recommended spacing between
the connector ends to the rail ends and adjacent compo-
nents such as Dome, SD Dome or Porter must be observed.
Fasten the connector through the bore hole with M8 screw
and MK2.
Tightening torque 16 Nm.
Insert pre-assembled screw set through the bore hole slot
to the speed rail, adjust the middle position and fasten.
The central position is located when the washer obscures
the two line marketings completely.
Tightening torque 10 Nm.
Using the right tightening torque ensures a small gap
remains between the washer and connector surface.
Mount each rail joint in the longitudinal direction of
a Dome Connector CW. The connector may only be
mounted in a roof tilt direction and not on „covings“ or
„ridges“. The connector must not be obstructed with
excessive ballast. During installation ensure that the screw
is loosely screwed in the bore hole.
Required material: K2 SpeedRail, K2 Dome block connec-
tor CW Set
A
min. 50
min. 50
max. 80
min. 100
A (1 : 10)
12 | 20
Installation of S-Dome System