POSITION SPEEDRAIL
INSTALL RAIL CONNECTORS
Prior to placing the SpeedRail as a base rail, insert a protec-
tion layer between the roof covering and the rail in order to
avoid any damages to the roof covering. With membrane
roofs the Aluminium-coated side shall face downwards. Place
the Speedrail onto the protection layer without penetrating
the roof. The protection must have to be placed under the
load bearing components Dome S1000 and Dome SD.
Position the protection mats and base rail according the re-
quirements of the array. The spacing between the mats/base
rails is determined by the module dimensions (module length
+ 20mm). ‚Connect‘ the K2SpeedRails to the protection
mats via the pre-cut WINGS.
The rail ends of the K2SpeedRails must not protrude the
protection mats.
Materials required: K2 SpeedRail, building protection mat
Dome 470x180x18 mm
Two SpeedRails are connected at the rail joint using a rail
connector. This locks the SpeedRails in the longitudinal
direction. Insert 2 M K2 slot nuts in the rail and turn 90°
clockwise to lock. Fasten rail connectors with two Bolts with
serrated under head M8. The connector should be between
the Dome S1000 and Dome SD.
If the rail lengths permit, the rail joint can also be positioned
directly below the Dome S1000 without a rail connector.
However, it must be ensured that the joint is between the
two fittings and under no circumstances directly at the
screw position.
Torque 14 Nm
Materials required: FlatConnector Set