Installation of S-Dome System
14 | 20
FIT DOME SD
Insert one M K2 slot nut in the rail and turn 90° clockwise
until it locks. Place the Dome SD onto the rail and align as
per the adjacent figure. The distance between Dome SD and
Dome S1000 is approximately equal to the module width.
Before fastening ensure care should be taken that the pro-
tection mat Scale 300x140x18 and its WINGS are under the
Dome SD and the rails at the array edges do not protrude.
Finally the Dome SD is loosely fastened with a bolt with
serrated under head.
Materials required: Dome SD, M K2, bolt with serrated
under head M8x20,, S8 locking washer, building protection
mat Dome SD 160x180x18 mm
5
of 9
Insert two M K2 slot nuts in the rail and turn 90° clockwise
until they lock. Thereafter, position the Dome S1000 on the
rail. Position the protection mat so that two WINGS are
under the Dome S1000. Only then fasten the Dome S1000
with two bolts with serrated under head M8x20.
Torque: 16 Nm
Materials required: Dome S1000, M K2, bolt with serrated
under head M8x20
FIT DOME S1000
4
of 9