1. Wrap and fasten one end of an ESD strap around your bare wrist, and connect the other end of the
strap to the ESD point on the front of an MX10016(see
Figure 60: ESD Point on the Front of an MX10016
MX10016
g100430
1
2. Either remove the cover panel from the available RCB slot (see
) or remove the
failing RCB (see Removing a Routing and Control Board).
Figure 61: Removing a Routing and Control Board Cover Panel
3. Remove the new RCB from the electrostatic bag, and inspect the RCB for any damage before installing
it into the chassis.
4. Lift the RCB by its sides, being careful not to strike the connectors against any object.
5. Carefully align the sides of the RCB with the guides inside the chassis.
6. Slide the RCB into the chassis ensuring that it is correctly aligned.
7. Grasp both the handles, and simultaneously rotate them clockwise until the RCB is fully seated and the
handles are vertical (see
).
The RCB begins the power-on sequence after it is fully seated.
161
Summary of Contents for MX10016
Page 1: ...MX10016 Universal Routing Platform Hardware Guide Published 2019 10 15 ...
Page 19: ......
Page 86: ......
Page 123: ......
Page 153: ......
Page 239: ...Figure 118 Moving the MX10016 Using a Mechanical Lift g100421 242 ...
Page 240: ...5 CHAPTER Troubleshooting Hardware Restoring Junos OS 245 Alarm Messages 249 ...
Page 241: ......
Page 249: ......
Page 277: ...Restricted Access Warning 281 ...
Page 292: ...Jewelry Removal Warning 296 ...
Page 295: ...Operating Temperature Warning 299 ...
Page 304: ...DC Power Disconnection Warning 308 ...
Page 308: ...DC Power Wiring Sequence Warning 312 ...
Page 311: ...DC Power Wiring Terminations Warning 315 ...
Page 320: ...Translation The emitted sound pressure is below 92 dB A per GR63 CORE 324 ...