Figure 62: Routing and Control Board Installation
g100432
8. To verify that the RCB is functioning normally, check the PWR LED on its faceplate and the CONTROL
BOARDS LED on the status panel. Both LEDs should light steadily shortly after the RCB is installed. If
the PWR LED is blinking yellow, there might be insufficient power available.
You can also use the the show chassis environment cb command to verify that the RCB is online.
See
“Power Requirements for MX10016 Components” on page 97
to ensure that you have adequate
power for the newly installed RCB.
Removing and Installing MX10016 Cooling System
Components
IN THIS SECTION
Removing an MX10016 Fan Tray | 163
Installing an MX10016 Fan Tray | 166
Removing an MX10016 Fan Tray Controller | 168
Installing an MX10016 Fan Tray Controller | 170
An MX10016 router has two independent, field-replaceable fan trays. Fan trays must be replaced within
the duration mentioned in
.
162
Summary of Contents for MX10016
Page 1: ...MX10016 Universal Routing Platform Hardware Guide Published 2019 10 15 ...
Page 19: ......
Page 86: ......
Page 123: ......
Page 153: ......
Page 239: ...Figure 118 Moving the MX10016 Using a Mechanical Lift g100421 242 ...
Page 240: ...5 CHAPTER Troubleshooting Hardware Restoring Junos OS 245 Alarm Messages 249 ...
Page 241: ......
Page 249: ......
Page 277: ...Restricted Access Warning 281 ...
Page 292: ...Jewelry Removal Warning 296 ...
Page 295: ...Operating Temperature Warning 299 ...
Page 304: ...DC Power Disconnection Warning 308 ...
Page 308: ...DC Power Wiring Sequence Warning 312 ...
Page 311: ...DC Power Wiring Terminations Warning 315 ...
Page 320: ...Translation The emitted sound pressure is below 92 dB A per GR63 CORE 324 ...