The shipper has the option to ship either the front panel separately or to ship the front panel along with
the chassis. If the front panel arrives with the chassis, set aside the front panel box until you are ready to
verify the contents of the order.
To unpack the chassis (see
):
Figure 44: Shipping Crate and Accessory Box
1. Move the shipping box to a staging area as close to the installation site as possible. While the chassis
is bolted to the pallet, you can use a forklift or pallet jack to move it. Make sure there is enough space
to remove components from the shipping box.
2. Position the shipping box with the arrows pointing up.
129
Summary of Contents for MX10016
Page 1: ...MX10016 Universal Routing Platform Hardware Guide Published 2019 10 15 ...
Page 19: ......
Page 86: ......
Page 123: ......
Page 153: ......
Page 239: ...Figure 118 Moving the MX10016 Using a Mechanical Lift g100421 242 ...
Page 240: ...5 CHAPTER Troubleshooting Hardware Restoring Junos OS 245 Alarm Messages 249 ...
Page 241: ......
Page 249: ......
Page 277: ...Restricted Access Warning 281 ...
Page 292: ...Jewelry Removal Warning 296 ...
Page 295: ...Operating Temperature Warning 299 ...
Page 304: ...DC Power Disconnection Warning 308 ...
Page 308: ...DC Power Wiring Sequence Warning 312 ...
Page 311: ...DC Power Wiring Terminations Warning 315 ...
Page 320: ...Translation The emitted sound pressure is below 92 dB A per GR63 CORE 324 ...