1.2
Customer Service
In accordance with the ESE 533 service interval, to be performed every 1000 service
hours, but at least once a year.
1.2.1
Maintenance contents
1.2.1.1
Standard equipment
Brakes
Test the brake.
Adjust the air gap of the magnetic brake.
Measure the air gap of the magnetic brake.
Electrical system
Test the contactors and/or relays.
Clean the motor with compressed air.
Carry out a frame leakage test.
Power supply
Test the immobiliser on industrial trucks with external charge connectors.
Travel
Correct the transmission oil level or grease filling of the transmission.
Chassis/structure
Text cut-outs triggered by the seat switch, gates, etc.
Check that the panels and covers as well as the floor plate with mounting brackets are
secure. Ensure they function correctly and are safe.
Hydraulic operations
Test the lift-limit cut-off/lift cut-off.
Adjust the lift mechanism.
Adjust the slide pieces.
Correct the hydraulic-oil level.
Test and adjust the pressure relief valve.
Agreed services
Carry out a test run with the rated capacity or a customer-specific load.
Lubricate the truck according to the lubrication schedule.
Demonstration after maintenance.
Steering
Lubricate steering gears or steering chain.
128
02.21 en-GB
Summary of Contents for ESE 533
Page 1: ...ESE 533 03 10 Operating instructions 51157401 02 21 en GB ESE 533...
Page 2: ...2...
Page 4: ...4 02 21 en GB...
Page 19: ...19 02 21 en GB...
Page 32: ...32 02 21 en GB...
Page 43: ...2 Displays and Controls 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 43 02 21 en GB...
Page 115: ...126 129 128 127 130 144 142 143 140 141 138 139 136 134 133 135 132 131 137 115 02 21 en GB...
Page 124: ...124 02 21 en GB...