6
Decommissioning the industrial truck
If the truck is to be out of service for more than a month, it must be stored in a frost-
free and dry room. All necessary measures must be taken before, during and after
decommissioning as described hereafter.
When the truck is out of service it must be jacked up so that all the wheels are clear
of the ground. This is the only way of ensuring that the wheels and wheel bearings
are not damaged.
Z
Jack up the truck, see page 107.
If the truck is to be out of service for more than 6 months, agree further measures
with the manufacturer's customer service department.
119
02.21 en-GB
Summary of Contents for ESE 533
Page 1: ...ESE 533 03 10 Operating instructions 51157401 02 21 en GB ESE 533...
Page 2: ...2...
Page 4: ...4 02 21 en GB...
Page 19: ...19 02 21 en GB...
Page 32: ...32 02 21 en GB...
Page 43: ...2 Displays and Controls 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 43 02 21 en GB...
Page 115: ...126 129 128 127 130 144 142 143 140 141 138 139 136 134 133 135 132 131 137 115 02 21 en GB...
Page 124: ...124 02 21 en GB...