16
6) Adjust solenoid valve cord (asm.)
7
to the
solenoid valve and the hot marker of the cord,
and connect it.
Connect 6P connector
!0!1
to CM52 connector
inside the electrical box.(Refer to “When the bird’s
nest prevention device is used, p. 13”.)
7) Connect air hose ø4 coming from the machine
head to the solenoid valve section and air hose
ø8 to the dust bag suction port respectively.
8) Fix the solenoid valve and the air hose on the
table with staple
8
supplied as accessories.
9) Connect the air pipe
!2
and set the air pressure to
0.6 MPa.
1. Fix the staple to such an extent
that the air hose is not crushed.
2. Determine the position of the
staple so that the cord and the air
hose do not hang from the table.
2) Fix solenoid valve (asm.)
1
with wood screws
2
supplied with the sewing machine as accessories.
3) Fix regulator (total asm.)
3
with wood screw
4
supplied with the sewing machine as accessories.
4) Connect ø6 and ø8 hoses attached to regulator
(total asm.)
3
to the respective solenoid valves.
5) Insert dust bag
5
into the top end of hose
9
for
dust bag and fix it with band
6
supplied with the
sewing machine as accessories.
φ
8
φ
4
• When air pressure is used under
the specified value, clamp trouble
will be caused.
1
2
4
3
6
5
9
5
9
!1
!0
7
!1
!0
6
8
!2