KE-2050/KE-2060, KE-2050R/2055R/KE-2060R Maintenance Manual
1-11
Rev. 2.00
1-3. Replacing the Servomotors
1-3-1. Replacing the X-Motor
Carry out the replacement work in the same manner as for the timing belt XM in 1-1-1.
1-3-2. Replacing the Y-Motor
Carry out the replacement work in the same manner as for the timing belt YM in 1-1-3.